Reduce throughtout time of stitching department of apparel industry by bottleneck analysis
| dc.contributor.author | Sarfraz Ahmad | |
| dc.contributor.author | Muhammad Bilal Younas | |
| dc.contributor.author | Muhammad Riaz | |
| dc.contributor.author | Muhammad Imran | |
| dc.date.accessioned | 2015-03-10T16:45:02Z | |
| dc.date.available | 2015-03-10T16:45:02Z | |
| dc.date.issued | 2014 | |
| dc.description.abstract | This project “Reduce throughput time of garments manufacturing'' in textile industry by collecting details related to stitching department .in this project we were trying to find issues related to decrease in productivity. Also we found the factor that was the main cause of decrease in productivity and increasing throughput time. Finally we obtained the solution of problem that how to reduce throughput time. The main purpose of this project to reduce throughput time and helps to reduce the faults that are the main cause to decrease in productivity. | en_US |
| dc.identifier.uri | https://escholar.umt.edu.pk/handle/123456789/1463 | |
| dc.language.iso | en | en_US |
| dc.publisher | University of Management and Technology | en_US |
| dc.subject | BS Thesis | en_US |
| dc.title | Reduce throughtout time of stitching department of apparel industry by bottleneck analysis | en_US |
| dc.title | Reduce throughtout time of stitching department of apparel industry by bottleneck analysis | en_us |
| dc.type | Thesis | en_US |
Files
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 1.71 KB
- Format:
- Item-specific license agreed upon to submission
- Description: