Browsing by Author "Muhammad Saqib"
Now showing 1 - 2 of 2
Results Per Page
Sort Options
Item Cosmo salus robo motive: CRM(University of Management and Technology, 2011) Saad Liaqat Ali; Abdullah Hasan Tufail; Muhammad SaqibA four Channel (forward, backward, left, right moving) vehicle to go near the target to perform the task operated by the operator standing at a far most distance of his requirement and . A Robotic Arm to pick and drop the targeted object. This is also controlled by the operator. Interfacing of Software and Hardware also helps to control the whole system via software, which is not only human interactive but also quite need of the hour. Switching of Video Cameras controlled through RF is quite helpful in the Cosmo Salus Robo Motive aka CRM to judge the kind and intensity of the target through visual of the case.Item Time table management system(University of Management and Technology Lahore, 2015) Muhammad Yasin; Muhammad SaqibOur idea finds out daily manual problem it was consisting a headache of staff member who generate and schedule the time table manually it was difficult to handle the daily problems. We designed time table management system for scheduling activities with respect to resources. We gave activities and resources as input of time table scheduler and he schedules all the activities automatically. We have four type of input, first is Group, it's mean group of activates. We can add group of activities and we can select the activities in add group of activities. In this section, group take two input, first Group Name and second Descriptions and then submit. The second category is Add Resources, Resource Name and Resource Type. Resource name mean, the name of resource and Resource Type has two type of input room and person. Third is Resource and Grouping, we can also select actives from Resource and Grouping. These are both combine when we are going to scheduling time table we can select activities from Resource and Grouping these are already entered. In this section we can choose resources and choose group of activities. Fourth is Activities Allocation: User can enter activity name and then select resource and group. Resource and Group has option for user if he write name of activity and then he can select Resource or Group. The time table project schedule all type of activities. All Activities can be different to each other. It can be labs, classes, seminars and examination this types of activities can be schedule sly and automated.