Browsing by Author "Muhammad Omer Baing"
Now showing 1 - 1 of 1
Results Per Page
Sort Options
Item Reduction of waiting time and down time by using SMED(University of Management and Technology, 2014) Muhammad Omer Baing; Muhammad Talah Baig; Rana Mohsin RashidNagina Group Pvt, ltd wanted to reduce their setup time and waiting time to increase their production and meet their customer's demand, in order to maintain their quality of fabric, they also want to reduce their down time during changing setup time in three sections warping, sizing, weaving. Nagina Group has different customers some in a country and other are from different countries. The average production is 1.5 lacs meter in a month. They face problem in waiting time, loading and unloading time in different section at the result the found low quality of their fabric. By using SMED technique we reduce their down time, waiting time in warping, loading and unloading time in sizing by brain storming, and down time in weaving section applying this method their down time is minimum. We use Mini tab for graphs.