M. Ibrahim BilalFaizan Nazir TahirJahanzaib Akram2025-11-242025-11-242020-07https://escholar.umt.edu.pk/handle/123456789/12430The paper describes the implementation of Pico-hydro turbine by using the application of manufacturing, assembly, and methodology. The paper describes the use of hydro-power as a renewable energy source, which is a big problem these days. Hydropower is abundant in various forms. Hydro-power can be obtained from a potential hydropower site with adequate water drainage and head. Pico water turbines are preferably used on the course of the river to generate water power. Research shows that the electricity generated by the Pico water turbine is particularly useful for rural villages in the north and hilly areas of Pakistan with around 30 houses with low electricity consumption, e.g., fluorescent lights and television or radio, and is very useful. Pico Hydro can also improve the standard of living of people in poor countries and rural areas where the government is having a hard time setting up the transmission grid lines. Our research work will present that hydropower systems of this size benefit in terms of cost and simplicity from different approaches in the design, planning, and installation than those which are applied to larger hydropower.enDesign and development of a pico hydro turbine for rural electrification in pakistanThesis