Example

LRC Welcomes you to the House of Knowledge

Image from Google Jackets

Impact of design changes on time and cost in construction projects case analysis of Mohmand Dam Hydropower Project and Metro Train Orange Line Project [MS Civil Engineering] / by Khawaja Muhammad Mohsin Lone

By: Material type: TextTextPublication details: Lahore : UMT. School of Engineering. Department of Civil Engineering, 2021Description: 131 p. CDSubject(s): DDC classification:
  • TP 627.8 KHA-I
Dissertation note: Report presented in partial requirement for MS degree in Civil Engineering Advisor : Dr. Muhammad Usman Rashid MS Department of Civil Engineering 2021 F2018136005
Item type: Theses and Term Papers
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Current library Call number Status Date due Barcode
UMT Main Campus TP 627.8 KHA-I (Browse shelf(Opens below)) Not for loan 144007

Report presented in partial requirement for MS degree in Civil Engineering
Advisor : Dr. Muhammad Usman Rashid MS Department of Civil Engineering 2021 F2018136005

School of Engineering

English

There are no comments on this title.

to post a comment.
© Copyright LRC, UMT 2021. All rights reserved.           Credit: Muhammad Ismail